Profesionales del metal

FOTOGRAFÍA

CONTACTAR CON ESTE PERFIL

DATOS PERSONALES

ID PERFIL:
2269
Nombre completo:
Andres Gonzalez
Fecha de nacimiento:
30-08-1964
Población:
No disponible.
Provincia:
Tarragona
CV:
Countries I had worked at:
Singapore,Mexico,Egypt,Lithuania,Turkey,Saudi Arabia Hawiyah,Malaysia,Indonesia,UK, Spain,Portugal ,Germany ,Guadeloupe (French Antilles) ,Venezuela ,Serbia ,Denmark, Morocco ,Saudi Arabia (Jizan)
Career
Professional Experiences
**Sept 2016 to March 2016
Project Materials Manager
TECNICAS REUNIDAS. Saudi Arabia (Jizan)
Jazan Refinery and Terminal Project (JRTP) &
Jazan Integrated Gasification Combined Cycle (JIGCC)
Short Temporary position: Site Project Mat’s Manager in Jizan refinery and combined cycle project being in charge of materials reception and issuing, client meetings and materials coordination of the whole project ,as well as the cross checking of mats available for piping construction.(piping constructability )
**Jun 2015 to April 2016
Project Materials Manager
SENER Thermo solar Project NOOR II and III
Site Project Mat’s ManagerQuarzazate Morocco Thermo solar project being in charge of materials reception and issuing, cross checking isometrics ,and its Tie-ins and mat’s availability with GAO program ,SENER In- House System.
**Nov 2014 to Feb 2015
Project Materials Manager
Amec Foster Wheeler (Denmark)
Biogen Idec P 2 project Pharma
Project Mat’s ManagerHillerod Biogen Idec Pharmacy project being in charge of materials reception and issuing, cross checking isometrics ,and its Tie-ins and mat’s availability withAMUSE Amec Foster Wheeler In- House System.
---------
**Sept 2014 to Nov 2014
Project Materials Manager
NIS oils Novi Sad (Serbia)
Foster Wheeler (Madrid ,Serbia)
NIS oils Serbia
Materials project preparation in Madrid head office the process and contract of materials management to be implemented in Serbia ,Learning FW procedures and operative in-house system CARMEN to be implemented in Serbia.Procurement and logistics activities. Visiting futures contractors premises for works shops and warehouses at site in Serbia
Due client reasons the project is on hold.
-------
- 3 -
**April 2013 to March 2014
Project Materials Manager
Augsburg Germany and French Antilles
MAN Diesel & Turbo SE 240 MW EDF project ,Pointe Jarry Guadeloupe (French Antilles)
Client EDF ,Electricite du France
Supervise and monitor SUB-CONTRACTOR’s procurement and logistics activities. Monitor performance by coordinating with SUB- CONTRACTOR’s procurement manager and logistics manager ,monitoring Tie-ins for start-up stage . Confirm the SUB-CONTRACTOR’s comply with Pointe Jarry overall management system, In-house management System, for equipment and materials including IT, support system for isometrics high pressure control execution.
Material Manager (Material Control Coordinator) in the Joint Venture EDF/MAN/EIFFAGE, and lead project management team ,monitor SUB- CONTRACTOR’s material status ,to be delivered on time to Client EDF procurement project management,as well as liaise logistics and material handling, to the construction site.
Coordinate between the head office in Augsburg Germany and work site Pointe Jarry.
**Sept 2012 to March 2013
Project Coordinator
CHIYODA corporation :Deep Conversion Project RPLC (PDVSA)
Pto La Cruz (VENEZUELA)
Project N2 Cold Boxes superintendent civil and mechanical
Assist and support local partner for Main Work Execute construction work with special technology for Main Work, how to control and manage local subcontractors for Main Work, control construction progress using Chiyoda’s established Construction Management System, how to carry out material control at site using Chiyoda’s computerized system. Deputy Mat´s Manager at site Coordinate with all concerned management staff at site and subcontractors on order to ensure the project specified quality and performance During execution phase after initial phase Maintain close communication with site construction team in order to support site construction team, ensure on-time completion of EW activities and the implementation of project control procedures in the following areas: -Logistics Construction resources Project completion , turnover and Tie-in`s mat´s availability Attend project meetings with client to review progress, changes in work Prepare the project reports for project status to client
**Jan 2012 toAugust 2012
Deputy Construction Manager
CPI LINDE GAS Sagunto II Separation Gas Plant
SAGUNTO SPAIN
Project N2 Cold Boxes superintendent civil and mechanical
control construction progress established Construction Management System, how to carry out material control at site ,schedule and progress control, .Coordinate with all concerned management staff at site and subcontractors on order to ensure the project specified quality and performance During execution phase after initial phase Maintain close communication with site construction team in order to support site construction teamcontrol procedures in the following areas: -Logistics
- 4 -
Construction resources Project completion , turnover and Tie-in`s mat´s availability Attend project meetings with client to review progress, changes in work Prepare the project reports for project status to client
……..
**Dec 2009 to Dec 2011
PROJECT MATERIALS MANAGER AND PIPING SUPERVISORGROUPE GENOYER (PHOCEENNE)SINES PORTUGAL
(Galp Oil Refinery reconversion project)
Project Mat’s Manager Sines Refinery Conversion being in charge of materials reception (Piping) and cross checking isometrics and mat’s available with EGX system In House System, HSE weekly meetings and coordination meeting with the client Note:Award winning during shut-down 2011And final released of the spare parts and preservation
….
**Jan 2008 TO Dec 2009
PROJECT MATERIALS MANAGER AND PIPING SUPERVISION
GROUPE GENOYER (PHOCEENNE)
SINGAPORE/MALAYSIA/INDONESIA.
ECC HOUDINI PROJECT SHELL (Jurong , Pula UlarIsland SINGAPORE)
In charge of all materials involved on the project and its inspection
Project materials manager in Singapore, I was responsible of 135 people for receiving , issuing controlling materials for Tie-ins in Singapore project
**Also technical advisor Piping supervision forSarawak SHELL project (Malaysia)
** Technical advisor in TOTAL project (Indonesia)And final released of the spare parts and preservation
….
**May 2007to Jan 2008(DYNATEC)…
Materials Controller Manager and Piping workshops and field supervisor
INITEC INDUSTRAIL PLANTS (TECNICAS REUNIDAS)
Hawiya Gas Expansion Project ARAMCO Saudi Arabia
In charge on isometrics prefabrication and materials run-reservations
Materials Controller managerwith one specific program MAT-TUB doing materials isos run-reservations receiving and issuing materials ,inspecting equipments ,once upon arrival on site and being with MATUB TECNICAS SYSTEM as well as a piping supervisor in prefabrication workshops and field.And final released of the spare parts and preservation
..…
**Nov 2006to May 2007(DYNATEC)
(Various roles) Piping supervisor, Civil, Steel structure and punch-list supervisor
FOSTER WHEELER (Mazeikiai Nafta FDD ,HDD Project Lithuania)
Being in charge of several differentdisciplines.
Piping Superintendent erection of high pressure lines, during prefabrication stage andcommissioning, preparation ,Tie-ins for the test packages tracking of punch list and preparing and attending hydro test.
- 5 -
Supervising all steel structure, equipments.Checkingsmooth finishin civil works, as well as underground cast iron for drainage of the plant.
…..
**July 2006to Nov 2006
Project Materials Manager
DRAGADOS INDUSTRIAL (MINATITLAN 3 PEMEX PROJECT MEXICO)
In charge of all materials involved on the project
In charge of a team of 65 people for control, equipments, cables piping materials etc...Coordinatingmaterialsreceived and issuing of it, toa several different contractors, isometricsprefabrication control and material run-reservations.And final released of the spare parts and preservation
….
**August 2004to July 2006(DYNATEC)
Project Materials Controller Manager and piping supervisor
TECNICAS REUNIDAS (TUPRAS PROJECT DIESEL/KEROSENE HYDRO PROCESING &CCR , (IZMIT TURKEY)In charge of materials control, equipments, cables piping materials etc...Coordinating the material received and issuance of it, to a several different contractors,isometricsand Tie-ins prefabrication control and material run-reservations. Attending daily progress project with the client meetings.Supervising prefabrication workshops and erection stage.And final released of the spare parts and preservation
….
**Nov 2002to August 2004(DYNATEC)
Project Materials Engineerand piping Superintendent
(TECNICAS REUNIDAS/KBR/JGC JointVenture)LNGPROJECT,UNIONFENOSA DAMIETTA(EGYPT)
In charge of all spare parts and piping erection
Reception, inspection of equipments spare parts mostly heat-exchangers, supervising prefabrication workshops, and field isometrics erection, assisting to the LNG tanks superintendent during construction stage and monitoring loading LNG gas arms on jetty loading area.
….
**Nov 2002to Nov 2002(DYNATEC)
Project Controls
TECNICAS REUNIDAS/KBR/JGC Joint Venture
LICUEFACTION NATURAL GAS PROJECT, (UNION FENOSA)MADRID/LONDON/HOUSTON
Project coordinator and project preparation FEED stage.
Coordinator among (MOC) Madrid operation centre and (LOC) London operation Centre, and revising the Technical Deviations
Periodically cooperation in RFQ Data Sheets at KELLOGG engineering office (London.) and KBR (Houston) Including IPMS program input Data (London).
…..
**Dec 1999to Nov 2002(DYNATEC)
Project Various RolesTECNICAS REUNIDAS
MAXIMIZATION OF GAS OIL PRODUCTION, ALEXANDRIA MINERAL OIL COMPANY
(ALEXANDRIA EGYPT) In charge of various roles on site construction.
Materials Superintendent and Mechanical and piping supervisor
Supervising the erection of Fire Water Pipes Lines,and high pressure lines for vacuum equipment and producing , HT packages Tie-ins,
Steam Tracing System supervisor and Control, verification and supervision of Materials received on site.And final released of the spare parts and preservation
- 6 -
Tanks farm supervisor on lay down area.
….
**Nov 1998to Dec 1999(DYNATEC)
ProjectPiping Supervisor and coordinator on two different projects with TR TECNICAS REUNIDAS HEXANODIOL PLANT (UBE) CASTELLON (SPAIN) AND SMOP REPSOL TARRAGONA (SPAIN)
In charge of various roles on site construction.
Piping supervisor UBE project in Castellon (Spain) and Technical Coordinator of hydraulics test
Piping Supervisor of Lateral Filters and aditivation in cooling towers ESINDUS included its hydraulics test on the Chemical Plant SMOP REPSOLTarragona (Spain)
….
**Nov 1997to Nov 1998
Project Piping and materials Supervisor
DUMEZ COPISA DIVISION DE MONTAJES INDUSTRIALES
AIR LIQUIDE ,LEXANGENERAL ELECTRIC PROJECT CARTAGENA (SPAIN)
In charge of various roles on site construction.
Piping Supervisor and materials inspectionQC Control (RX) assistant.
Erection Coordinator of Cold Towers AIR LIQUIDE.
….
**Jan 1994to Nov1997
Project Piping and materials Supervisor
EMMSA MONTAJES INDUSTRIALES
VARIOUS DIFFERENT PROJECT LOCATED IN SPAIN ,Tarragona ,Cartagena
In charge of various roles on site construction.
LEXAN PROJECT ,DOW CHEMICAL ,BP and REPSOL94-97
**Materials Supervisor and Piping prefabrication high press lines In LEXAN PROJECT GENERAL ELECTRIC Cartagena (Spain).
**REPSOL 96:Warehouse Manager and controls materials prefabrication supervisor and quality control Project 22051 REPSOL POLIPROPILENE II Tarragona (Spain).
**DOW CHEMICAL (engineering department) RETROFIT I (Insite)
Supervisor of requisitions materials and verification of materials and pipes: Supervision of isometric prefabricated in RETROFIT I (Insite) Tie-ins shutdown 95 Project Tarragona).
**BP British Petroleum
Material manager and piping Supervisor on the technical revision plant revision
….
**Jan 1993to Jan 1994
COMPOUND PLANTSITE POM POLIMERS
REPSOL AND DOW CHEMICAL TARRAGONA (SPAIN)Assistant on various roles.
Cooperation in department of Site Logistics DOW CHEMICAL.Implementation assistant of Program Work, Blue Print.
Cooperation in management of warehouse of compound plant and improvement of it REPSOL QUIMICA.
….
**Jan 1991to Jan 1993
DUMEZ-COPISA MONTAJES INDUSTRALESREPSOL VARIOUS PROJECTS TARRAGONA (SPAIN)Assistant on various roles:
- Project T-1 1 Assistant of piping supervisor.
- Project T-13 Under supervision of UOP Material manager assistant.
- 7 -
- ProjectT08 1ª2ªPhase Reception, inspection of materials and Control Quality certificates.
-Project T08 3ªPhase(Cooperation with Turbo Lufttechnick Flare Blower).Warehouse Chief and QC Control. Supervision and operatives of erection.
- Project T08 OFF SITEReception and verification of erection materials, supervision assistance in DiseprossaEngineeringprojects. Assistant of piping supervisor
….
**Dec1986to Jan 1991
Various Roles on a Nuclear plant
DUMEZ-COPISA NUCLEAR DIVISION AND TECH-ATOM
NUCLEAR POWER PLANT ASCO TARRAGONA (SPAIN)
Assistant on various roles:Supervisor assistant for inspection in whole anti earthquake system of contention building and verification of all materials to recharge the Reactor 1989 in Nuclear power plant ASCO Tarragona (Spain)TECNATOM Técnicas Del Átomo SA
Control and preparation of small projects and its Materials Collaboration in inspection of safety valves in contention building and preparation of communication system for coordination the change of fuel reactor rods in Nuclear Power Plant ASCO.Tarragona.
….
**Jan 1985to Dec 1986
Piping and WH supervisor Assistant
DUMEZ-COPISA MONTAJES INDUSTRIALES
REPSOL ETILEN-PIPE LINE TARRAGONA (SPAIN)
Assistant on various roles: WH and piping supervisor assistant in an Ethylene pipe line duct from Repsol North to south and quality control assistant
….
**Jan 1980to Dec 1983
Military Sergeant (military pharmacy laboratory)
SPANISH ARMY FORCES (VALLADOLID) Spain
------------------------------------------------
Education
*Major School of Languages Mayor Torres Quevedo and BUP/COU (Spain)
*Course of non destructive metallurgic test in Institute of Technology E.Labin Bilbao
*Course of welding test tubes in Nuclear Power Plant ASCO Spain
*Tarragona.Course of 400 hours for training of method work and its materials innuclear Power Plant with TECNATOM C.N.ASCO&Torrejon Madrid.
*Course of 400 hours of Piping in Institute BETTA (Italy).
*Military Chemist. Lab Pharmacy Military Valladolid (Spain)
*Mechanical Engineering IT Tech Alexandria Egypt)Fuaduniversity
* American Egyptian Institute & British Council School of languages (English) and (Arabic) Alexandria Egypt
Especialidades:
No disponible.

ESPECIALIDADES

Encargado

- Sin especialidades

Supervisor

- Sin especialidades

ESPACIO PUBLICITARIO

— Página web creada por versiongalega.com